Riser Handling Equipment on the West Mira Rig

Check out Seadrill Riser Handling equipment on the West Mira Rig. The Marine Riser is the large diameter pipe that connects the rig to the seafloor.

Did you know that each riser pipe is 75 feet (22.86m) long and weighs roughly 20 tonnes.